Sep 11, 2024

Our Complete Journey

Building a Road to Last

Have you ever wondered what it takes to build a road that meets county standards and stands the test of time? Let us take you through the journey of how Texas Builder Pros constructed a private road for a customer in Johnson County, TX—ensuring durability, precision, and quality every step of the way.

The Blueprint for Success

Our journey began when a customer approached us with a vision: to divide their land into smaller lots. But before moving forward with their plans, they needed a road that complied with the county’s strict guidelines. We got right to work, starting with engineered drawings. These weren’t just blueprints; they were the foundation of our success, packed with all the design elements Johnson County required.

Getting the Green Light

With the detailed plans finalized, we presented them to the county for approval. After a bit of anticipation, we received the go-ahead! The plat was approved, and it was time to break ground. However, before any dirt was moved, we needed to ensure the road was laid out with absolute accuracy.

Marking the Path

Marking the Path

To ensure the road was laid out perfectly, we utilized advanced tools such as total stations and GPS equipment, marking the ground with pinpoint accuracy. This allowed us to create a detailed map directly on the earth, ensuring the road’s exact placement.

Digging In

Digging In

The excavation phase was next. We dug out the road, ditches, and approaches, making precise adjustments—lowering and raising certain areas as needed. In spots where we built up the ground, we conducted compaction tests to confirm the soil’s strength, ensuring a sturdy foundation. We were committed to avoiding shortcuts because a road is only as strong as its base.

Stabilizing the Ground

Stabilizing the Ground

Going even deeper, we injected a soil stabilization product (Earthloc’s proprietary stabilization formula) four feet into the base of the road. This crucial step helped ensure the road wouldn’t shift or crack due to Texas Blackland dirt’s tendency to expand and contract through wet and dry seasons.

Building the Road Base

Building the Road Base

With the groundwork prepared, we installed 8 inches of road base. To achieve the desired level of compaction, we used water to compact the base thoroughly, ensuring it was ready to support the road’s surface.

Concrete Approaches and Sidewalks

Concrete Approaches and Sidewalks

Next, we turned our attention to the concrete approach and sidewalks. These areas were installed with precision, providing smooth, durable access points for vehicles and pedestrians alike.

Final Grading and Chip Seal

Final Grading and Chip Seal

Before moving on to the chip seal, we completed the final grading of the ditches. Then, we applied a three-coat chip seal, which serves as the top layer of the road. This method adds a durable, weather-resistant surface that withstands heavy use and changing seasons.

Finishing Touches: Hydroseeding

Finishing Touches: Hydroseeding

As the final step, we hydroseeded all disturbed areas along the road and surrounding landscapes. This helped plant grass and restore the natural beauty of the area, leaving everything clean and well-maintained.

At Texas Builder Pros, we’re not just building roads—we’re paving the way for our customers’ dreams with precision, quality, and a commitment to lasting results.

Photo Gallery

Ready to build with a contractor you can trust?

Contact us today for a consultation and experience the difference that quality craftsmanship and transparent communication can make. Don't risk your investment – let us build your vision with confidence and expertise.

Get a Quote
by Phone Today
Call Us Now

817-203-3222

Request a Quote
Online
Request a Quote

* We'll Get Back to You Soon

3506 FM 66,
Grandview, TX 76050

Email us : [email protected]

Call us : 817-203-3222